BIM MEP modelling and clash detection in London
Revit MEP models, clash detection and construction-ready drawings, so ducts, pipes and containment actually fit the ceiling void, the riser and the plant room.

What BIM coordination is for
See the clashes before site sees them
Pipe versus beam, duct versus sprinkler, tray versus damper — resolved in the model.
A model the installer can follow
Not a pretty picture: coordinated services with space for access, joints and installation sequence.
London & Home Counties
Greater London plus Surrey, Kent, Essex, Hertfordshire, Berkshire and Buckinghamshire.
Usable file formats
Revit, with IFC and Navisworks files when the project team works in those tools.
Coordination services for design teams and contractors
Appoint us to author the MEP model, to federate models from several disciplines, or to run clash detection on a package that already exists.
Revit MEP modelling
Mechanical, electrical and public health services built in Revit, to an agreed level of detail.
Federated models
Combining architectural, structural and services models so everyone is looking at the same building.
Clash detection
Systematic checks, typically in Navisworks, with a clash report and a proposed resolution for each conflict.
Ceiling void coordination
The tightest space on most London fit-outs: ducts, pipes, trays, lights, sprinklers and access all sharing a shallow zone.
Riser and plant coordination
Vertical routes and plant rooms set out so equipment can be installed, maintained and eventually replaced.
Builders' work
Openings, plinths and penetrations issued from the coordinated model.
Drawing production
Plans, sections, isometrics and fabrication-ready views taken from the same model, not redrawn by hand.
As-built modelling
Updating the model during construction so the handover files reflect what was actually installed.
Design support
We can also originate the MEP design itself, then carry that model through coordination and installation.

Clash detection that leads to a decision, not just a red blob
A clash report is only useful if someone decides how to move the duct, the pipe or the structure. We work through the conflicts with the design team and record the agreed solution in the model.
On refurbishment and fit-out work in London, the existing structure is often irregular: downstand beams, old voids, and plant that has to stay live. The model has to start from a survey, not from an idealised new-build grid.
We agree the rules for clearance, access and which discipline moves first, then run the checks on a regular cycle as the other models are updated.
- Clear clash rules, so the report is not full of noise
- Navisworks and IFC exchange with the wider team
- Resolved clashes written back into the Revit model
- Coordination meetings supported with marked-up views
- A model that installation can follow on a tablet on site
From received models to a coordinated issue
Set-up
File standards, coordinates, levels of detail and clash rules.
Model
Author or tidy the MEP model, and federate the other disciplines.
Detect
Run clash tests and group the results so they can be decided.
Resolve
Agree moves with the team and update the model.
Issue
Drawings, model files and, if we install, a model the site team uses.

Coordination for HVAC, electrical and every other service
BIM coordination is most valuable when the same team will also design or install the systems. We do both, or we can coordinate a package for another contractor.
Related pages
Areas
Questions
Do you only model, or do you also design the systems?
Either. We can author a Revit MEP model from an existing design, or we can produce the design and the model together.
Which software do you use?
Revit for modelling, and Navisworks for federation and clash detection. We issue IFC when other teams need an open format.
Can you coordinate someone else's MEP design?
Yes. We will review the incoming information first and tell you if it is complete enough to coordinate, or if parts need to be rebuilt.
What level of detail do you model to?
We agree this at the start. Design coordination is usually modelled to a level that proves routes, plant size and access. Installation and fabrication need more product-level detail. See our note on LOD 300 and LOD 400 if you want the industry terms explained.
Will the site team be able to use the model?
That is the point of the exercise. We issue views and files that installers can follow, and we can be the team that installs to them.
Need a Revit MEP model or a clash review?
Call us, or leave your phone number and we will call back to talk through the models you already have and the coordination you need.
- London and the Home Counties
- Design-only, BIM-only or full design and installation
- Revit, IFC and Navisworks deliverables