Installation · London & Home Counties

MEP installation and commissioning in London

Our engineers install mechanical, electrical and public health systems to the coordinated Revit model, then test, balance and hand over the records the building will need.

Two engineers on a London construction site checking a Revit MEP model on a tablet

Installation that follows the model

  • The team that modelled it can install it

    Site questions are answered by people who already know why a duct moves, or why a board sits where it does.

  • Less improvisation on site

    Clashes have already been worked through, so installers are not inventing routes in a finished ceiling.

  • London & Home Counties

    Greater London plus Surrey, Kent, Essex, Hertfordshire, Berkshire and Buckinghamshire.

  • Model to handover

    As-built information and O&M records at completion.

What we install and hand over

From first fix to a commissioned system

We can install the full MEP package, or a defined part of it, in new-build frames, fit-outs and occupied refurbishment.

Mechanical installation

Ductwork, air handling, air conditioning, heating plant, pipework and insulation, installed to the coordinated drawings.

Public health installation

Water, drainage and sanitary systems, tested as they go.

Electrical installation

Containment, cabling, boards, lighting and accessories, inspected and tested.

Low voltage installation

Fire alarm, data, access control and CCTV, installed with the electrical package.

Occupied buildings

Phased work, temporary services and agreed working hours, planned from the survey and the model.

Builders' work and making good interfaces

Openings and supports set out from the model, coordinated with the principal contractor.

Testing and balancing

Air and water volumes, functional tests, and electrical inspection and testing.

Controls set-up

Local controls and, where present, connections to a building management system.

Handover information

Commissioning records, O&M information, as-built drawings and an updated model.

Engineering team reviewing a 3D BIM model of building services on a large screen
On site with the model

Engineers who can open the model on a tablet

A coordinated model is only valuable if the people installing the work can see it. We take the same Revit information onto site, so a pipe route or a damper location is not being guessed from a paper plan that is already out of date.

When something in the existing building does not match the survey, we update the model rather than quietly walking the pipe around the problem. That is how the as-built information stays true.

Commissioning is planned, not squeezed into the last afternoon. Air and water systems are balanced, electrical systems are tested, and the records are issued with the O&M information.

  • Installation to coordinated Revit drawings
  • Site queries answered against the model
  • Phased work in occupied buildings
  • Air, water and electrical testing
  • As-built model or drawings at handover
Process

How installation is organised

  1. Ready for site

    Model issued, plant and materials procured, access and programme agreed.

  2. First fix

    Plant, risers, containment and principal routes installed and inspected.

  3. Second fix

    Terminals, accessories, insulation and connections completed.

  4. Commission

    Testing, balancing and controls set-up.

  5. Handover

    Records, demonstration, O&M information and as-built files.

Exposed ventilation ductwork and ceiling cassette air conditioning in a London office
The design that comes first

Installation of the systems we also design

You can appoint us to install a package we have designed, or to install from a coordinated model produced with your design team. The service pages for each system explain the technical scope.

Related pages

Areas

FAQ

Questions

Do you install systems you have not designed?

Sometimes, if the design and the model are coordinated enough to install from. We will review the information first and tell you if it needs more work before it is ready for site.

Can you work in an occupied office or home?

Yes. We survey, agree phasing and working hours, and keep temporary services in place where they are needed.

What commissioning do you include?

Air and water balancing where those systems are part of the package, functional testing of plant and controls, and electrical inspection and testing. The exact tests depend on the systems installed.

Do we get an as-built model?

We issue as-built information. Where we have authored the Revit model, we update it to reflect what was installed and issue that with the records.

Where do you install?

Greater London and the Home Counties, so the site team can attend for surveys, progress and commissioning without long journeys.

Contact

Planning an MEP installation?

Call us, or leave your phone number and an engineer will call you back to talk through the building, the programme and the next steps.

  • London and the Home Counties
  • Design-only, BIM-only or full design and installation
  • Revit, IFC and Navisworks deliverables